{"id":33873,"date":"2026-09-24T16:39:36","date_gmt":"2026-09-24T14:39:36","guid":{"rendered":"https:\/\/hiptown.com\/?p=33873"},"modified":"2026-09-24T16:43:12","modified_gmt":"2026-09-24T14:43:12","slug":"office-relocation","status":"publish","type":"post","link":"https:\/\/hiptown.com\/en\/office-relocation\/","title":{"rendered":"Office relocation: how to avoid disrupting your team?"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container has-pattern-background has-mask-background nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1372.8px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:20px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p>Moving offices is not just about transferring furniture and equipment from one address to another. To avoid disrupting the team, the move should also be treated as <strong>a business continuity project<\/strong>, not simply as a logistical transfer: define what absolutely needs to be operational from day one, organize the transition between the two sites and allow a few days to stabilize the new setup.<\/p>\n<p>A move can be perfectly organized from a logistical standpoint and still disrupt day-to-day operations. The boxes arrive, workstations are installed, but some access points do not work, a team is still waiting for equipment, meeting rooms are not yet usable or no one knows exactly who should resolve the issues that arise.<\/p>\n<blockquote class=\"hiptown-takeaway\">\n<h2>Key takeaways<\/h2>\n<p>An office relocation needs to be planned around <strong>business continuity<\/strong> just as much as around the physical move.<\/p>\n<p>Before the transition, identify what absolutely needs to work from the first day: internet connection, access, tools, essential equipment, meetings and client reception.<\/p>\n<p>Depending on the company&#8217;s setup, the move can take place all at once or in stages. A short overlap between the two sites, a few days of remote work or a temporary workspace can also make the transition from one address to the other more secure.<\/p>\n<p>On move day, a small number of designated contacts should be able to manage service providers and make quick decisions without involving the entire team.<\/p>\n<p>Finally, not everything needs to be completed by the time employees arrive. The priority is to secure anything that could genuinely prevent the team from working, then adjust the rest after a few days of actual use.<\/p>\n<\/blockquote>\n<h2>Before the move, define the minimum operational setup for day one<\/h2>\n<p>Preparing for an office move often starts with an inventory: furniture, IT equipment, archives and equipment to keep, replace or transfer. This step is necessary, but on its own it does not tell you whether the company will actually be able to work in the new premises.<\/p>\n<p>A second list is therefore worth creating: <strong>what needs to be operational as soon as the team arrives<\/strong>.<\/p>\n<p>For sales teams, that may mean phone systems and access to the CRM. For other employees, the priority may be access to business applications or certain servers. A company that regularly welcomes clients should also take into account any meetings scheduled around the relocation date.<\/p>\n<p>The point of this approach is to rank issues according to their real impact. A printer being unavailable for two days will not have the same consequences as an internet outage affecting thirty employees. Likewise, an unfinished break area does not necessarily justify postponing the team&#8217;s move-in.<\/p>\n<div class=\"hiptown-article-table\">\n<table>\n<thead>\n<tr>\n<th>Essential use to maintain<\/th>\n<th>Risk on arrival day<\/th>\n<th>What to secure before the transition<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Digital tools<\/td>\n<td>Internet connection or software unavailable<\/td>\n<td>Internet tested, access and login credentials working<\/td>\n<\/tr>\n<tr>\n<td>Calls and external communication<\/td>\n<td>Phone system unavailable<\/td>\n<td>Lines transferred or an alternative solution in place<\/td>\n<\/tr>\n<tr>\n<td>Internal or client meetings<\/td>\n<td>Meeting rooms unusable<\/td>\n<td>At least one equipped and bookable room<\/td>\n<\/tr>\n<tr>\n<td>Office access<\/td>\n<td>Employees unable to enter<\/td>\n<td>Access badges and entry procedure tested<\/td>\n<\/tr>\n<tr>\n<td>Specific equipment<\/td>\n<td>Equipment still in transit<\/td>\n<td>Priority transfer and installation<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The goal is not to have a &#8220;perfect&#8221; office before employees arrive. Some storage, decoration or secondary fit-out work can be completed later. What matters is knowing exactly <strong>what cannot afford to wait<\/strong>.<\/p>\n<h3>A simple timeline to avoid concentrating every decision at the last minute<\/h3>\n<p>The exact schedule will depend on the size of the company, technical constraints and the time available. But a few milestones can help spread decisions over time instead of leaving everything until the final days.<\/p>\n<div class=\"hiptown-article-table\">\n<table>\n<thead>\n<tr>\n<th>Indicative timing<\/th>\n<th>Priority action<\/th>\n<th>Main owner<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>30 days before<\/td>\n<td>Appoint the project lead, identify critical activities and coordinate the main service providers<\/td>\n<td>Management \/ Office Manager<\/td>\n<\/tr>\n<tr>\n<td>15 days before<\/td>\n<td>Confirm the transfer plan for equipment, IT, phone systems and access<\/td>\n<td>Office Manager \/ IT<\/td>\n<\/tr>\n<tr>\n<td>7 days before<\/td>\n<td>Confirm team organization, any remote-working days and meetings that need to be rescheduled<\/td>\n<td>Office Manager \/ HR \/ managers<\/td>\n<\/tr>\n<tr>\n<td>Day before<\/td>\n<td>Test badges, internet connection, priority workstations, meeting rooms and the visitor journey<\/td>\n<td>Office Manager \/ IT \/ service providers<\/td>\n<\/tr>\n<tr>\n<td>Move day<\/td>\n<td>Oversee the transition, centralize incidents and keep a decision-maker available<\/td>\n<td>Designated contacts \/ management<\/td>\n<\/tr>\n<tr>\n<td>Day +1<\/td>\n<td>Prioritize issues that prevent people from working normally<\/td>\n<td>Office Manager \/ IT<\/td>\n<\/tr>\n<tr>\n<td>Day +7<\/td>\n<td>Review how the space is actually being used and adjust anything that is still complicating day-to-day work<\/td>\n<td>Office Manager \/ managers<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>This timeline is not intended to replace the moving company&#8217;s schedule. Its purpose is to organize <strong>business continuity around the relocation<\/strong> and make it clear who is responsible for leading or making decisions at each stage.<\/p>\n<h2>Plan the transition, not just the moving date<\/h2>\n<p>&#8220;We are moving on Friday&#8221; gives everyone a date. It still does not explain how the company will operate between the last day in the old office and the first day in the new one.<\/p>\n<p>Yet this is exactly where many of the risks are concentrated: equipment has already left while a team still needs it, the internet connection at the new site is not fully operational, a meeting is scheduled during the move, several service providers are working at the same time or employees arrive before their area is ready.<\/p>\n<p>The moving company&#8217;s schedule should therefore be supplemented by <strong>an internal transition plan<\/strong>.<\/p>\n<h3>Move everything at once or proceed in stages?<\/h3>\n<p>For a small team and a relatively straightforward relocation, moving everything at once may be the clearest option. Equipment can be transferred while employees are away, for example at the end of the week, and the new office is ready when they return.<\/p>\n<p>As headcount increases, or when certain roles depend on specific equipment, a phased move may be safer.<\/p>\n<p>One team may move into the new premises before the others. Some functions can remain temporarily in the old office. IT equipment may be transferred in a different order from the furniture. The key is to understand the dependencies: <strong>who needs what in order to keep working, and from what point?<\/strong><\/p>\n<p>Remote work can also act as an adjustment variable. One or two days working from home for some employees can make it easier to free up space while the move is taking place. It should not, however, become an automatic solution if certain functions require a physical presence, specific equipment or regular face-to-face interaction.<\/p>\n<p>Above all, the chosen scenario should prevent <strong>the entire company from depending at the same time on a transition that has never been tested<\/strong>.<\/p>\n<h3>Identify the few hours that are genuinely critical<\/h3>\n<p>Not every stage of an office move carries the same level of risk.<\/p>\n<p>The critical point may be when servers are shut down, when phone lines are switched over, when the keys to the old site are handed back or when an essential piece of equipment is in transit between the two addresses.<\/p>\n<p>Identifying these periods makes it possible to plan a specific organization instead of treating the whole move as one long interruption.<\/p>\n<p>A team might, for example, finish earlier before the IT transfer begins. Client meetings can be avoided during a specific time slot. Some functions can remain remote until confirmation that their working environment is ready.<\/p>\n<p>Decisions like these are often what prevent the relocation from spilling over into everyday operations.<\/p>\n<h3>Allow some breathing room between the old and new offices<\/h3>\n<p>When contractual conditions and budget allow, a few days of overlap between the two sites provide an additional safety margin. This gives the company time to test the new office before the whole team moves in.<\/p>\n<p>This overlap is not always possible. The lease may be ending, the new premises may not yet be available or fit-out work may be delayed. In that case, it is better to plan a fallback solution before the problem occurs.<\/p>\n<p>Depending on the duration and the number of employees concerned, this may involve remote work or <a href=\"https:\/\/hiptown.com\/en\/temporary-offices-renovation-works\/\">temporary offices<\/a>. The interim solution does not need to reproduce the usual setup exactly: its role is to prevent a gap between the two locations from bringing the company to a standstill.<\/p>\n<h2>Test the new office as if the team were arriving tomorrow<\/h2>\n<p>An office can officially be available without actually being ready for its occupants.<\/p>\n<p>The day before move-in is not the ideal time to discover that an access badge does not work, a meeting-room screen is not connected or some employees cannot access the network they need.<\/p>\n<p>A pre-move inspection is therefore more useful when it goes beyond simply checking that &#8220;everything looks ready&#8221;. It can be worthwhile to reproduce the actual day-one journey: <strong>enter the building, access the office, reach a workstation, log in, make a call, book a room and start a video conference<\/strong>.<\/p>\n<p>This real-life test reveals problems in the same order in which employees are likely to encounter them.<\/p>\n<p>It also helps check sequences that are easy to overlook. Will visitors know where to report? Can deliveries be received? Will employees arriving early or late be able to enter the building? Who should they contact if a badge stops working?<\/p>\n<p>Not everything requires the same level of testing. Again, priority should go to anything whose failure would immediately affect several people or a critical activity.<\/p>\n<p>For companies looking to reduce the technical and logistical preparation required, <a href=\"https:\/\/hiptown.com\/en\/our-offers\/managed-offices\/\">Managed Offices<\/a> can reduce the number of elements that need to be set up before the team arrives: furniture, internet connection, meeting rooms and services are already integrated into the workspace. Company-specific IT access, business tools and any specialized equipment still need to be secured.<\/p>\n<h3>A real-world example at Hiptown<\/h3>\n<p>A company specializing in the equipment and maintenance of professional kitchens was already occupying part of a floor at Hiptown when an adjacent area became available. Its objective was to expand its offices without interrupting business operations.<\/p>\n<p>Hiptown privatized and fully refitted the additional space according to the company&#8217;s specifications, coordinating the work before move-in. The teams were therefore able to transition directly into a workspace adapted to their organization, without having to manage the various contractors themselves during the move. The company now occupies three quarters of the floor and recently renewed its commitment for a further 24 months.<\/p>\n<p>This example illustrates the value of treating an office move as a business continuity project: when fit-out and coordination are secured in advance, there are fewer variables to manage on move day. For companies that want to delegate part of this preparation, Hiptown also offers <a href=\"https:\/\/hiptown.com\/en\/our-offers\/how-to-optimize-your-move-and-the-layout-of-your-new-office\/\">support for office relocation and fit-out<\/a>.<\/p>\n<h2>Give teams the information they will actually need<\/h2>\n<p>Changing offices inevitably raises questions: when do we need to leave the current premises? Should we come into work on move day? What do we need to take with us? How do we access the new site? Where will already scheduled meetings take place?<\/p>\n<p>The later these answers arrive, the more employees will seek information individually from the Office Manager, HR or their manager. On the other hand, sharing details too early when they may still change can create confusion.<\/p>\n<p>The overall timeline can therefore be communicated in advance, with information becoming more detailed as the moving date approaches.<\/p>\n<p>A few days before the move, everyone should at least know their last day at the old site, their first day at the new one, any planned remote-working days, what they need to take with them and whom to contact if they encounter a problem.<\/p>\n<p>A practical guide can bring together the address, transport options, access procedures, opening hours and how shared spaces work. This prevents information from being scattered across multiple emails or messages.<\/p>\n<p>It is also useful to state clearly <strong>what will not yet be fully completed<\/strong>. A team is more likely to accept that a secondary area is still being fitted out if they know about it and if it does not affect their work.<\/p>\n<p>In companies with at least 50 employees, an office relocation may also require <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000043975196\" target=\"_blank\" rel=\"noopener\">information and consultation of the CSE<\/a> when it results, in particular, in a significant change to working conditions. This should therefore be anticipated early enough in the relocation schedule.<\/p>\n<h2>On move day, not everyone needs to manage the relocation<\/h2>\n<p>On the day of the move, the best organization is not necessarily the one involving the largest number of people. A small number of clearly identified contacts are generally enough to coordinate service providers, check the key stages and deal with unexpected issues.<\/p>\n<p>Roles should be kept simple: who liaises with the moving company? Who validates that IT systems are back online? Who has the contact details for the new building manager?<\/p>\n<p>But one other role should also be defined: <strong>who has the authority to make quick decisions?<\/strong><\/p>\n<p>If equipment is delayed, should a team&#8217;s arrival be postponed? If a meeting room is not operational, should a meeting be moved? If the IT transfer takes longer than expected, who decides whether remote work should be extended?<\/p>\n<p>These decisions are much easier when the person responsible and the possible alternatives have been identified in advance.<\/p>\n<p>Meanwhile, employees who have no role in the move should, as far as possible, be able to continue working normally. Depending on the chosen scenario, they may work remotely, remain temporarily at the old site or go directly to the new premises once their area is ready.<\/p>\n<p>Important client meetings deserve the same level of attention. Keeping them away from move day \u2014 by rescheduling them, holding them by video conference or using another space \u2014 prevents a logistical issue from becoming visible outside the company.<\/p>\n<h3>Prepare a Plan B for a few critical functions, not for the entire move<\/h3>\n<p>Preparing a complete fallback solution for the whole company would often be disproportionate.<\/p>\n<p>Some functions, however, cannot afford to be blocked for several hours. For these, it is useful to know in advance what happens if the internet connection is ultimately unavailable, access to the building is delayed or an essential piece of equipment does not arrive on time.<\/p>\n<p>The backup plan can be very simple: a temporary return to remote work, keeping a few workstations at the old site, using an external workspace or postponing a non-urgent task.<\/p>\n<p>What matters is that the decision does not have to be invented when the problem occurs.<\/p>\n<h2>Treat Day +1 and Day +7 as part of the office move<\/h2>\n<p>Once the boxes have disappeared and the workstations are installed, the move may seem complete. Yet this is often when actual use of the office reveals the remaining problems.<\/p>\n<p>A meeting room performs poorly for video calls. Some employees repeatedly encounter access problems. A team is missing a piece of equipment. A process that looked fine on paper proves impractical in day-to-day use.<\/p>\n<p>Rather than dealing with this feedback piecemeal, a short <strong>stabilization phase<\/strong> can be built into the project from the start.<\/p>\n<h3>Day +1: fix anything that prevents people from working<\/h3>\n<p>The first few hours reveal the issues with an immediate impact: internet connection, access, tools, essential equipment, meeting rooms or client reception conditions.<\/p>\n<p>These issues should be escalated quickly to an identified contact. The goal is not to create an additional process, but to avoid the same problem being reported separately by ten people to three different departments.<\/p>\n<p>This first day also helps determine whether the planned scenario matches reality: were the teams able to settle in as expected? Did certain functions encounter an issue that had not been anticipated? Does a temporary solution need to be extended?<\/p>\n<h3>Day +7: look at what actual use has revealed<\/h3>\n<p>One week later, the questions change.<\/p>\n<p>The issue is no longer simply whether the team can work, but whether certain choices are unnecessarily complicating day-to-day operations: the position of a piece of equipment, the organization of a shared area, how meeting rooms work, the flow of information or the need for additional storage.<\/p>\n<p>These adjustments could not necessarily have been anticipated before move-in. They become visible because the office is now being used under real conditions.<\/p>\n<p>Planning this second review also avoids trying to decide everything before the move. Some questions are simply better resolved <strong>after observing how the workspace functions for a few days<\/strong>.<\/p>\n<p>The success of the relocation should therefore not be measured solely by whether the moving company kept to schedule. A much more practical indicator is how quickly employees return to a normal working day.<\/p>\n<h2>A successful office move ultimately goes almost unnoticed<\/h2>\n<p>Changing offices always involves some adjustment. But it should not force the entire company to spend several days resolving access, connectivity, equipment or organizational problems.<\/p>\n<p>Defining the minimum operational setup for day one, building a genuine transition plan, testing the new site, clearly assigning responsibilities for move day and planning a short stabilization period all help reduce this disruption.<\/p>\n<p>In this sense, <strong>a successful office move is one that the team experiences as little as possible as a disruption<\/strong>.<\/p>\n<p>When the schedule is tight or the company wants to reduce the logistical burden of moving in, using already equipped offices can also simplify the transition from one address to another, <strong>whether for a long-term setup or a temporary transition period<\/strong>.<\/p>\n<p><strong>Are you planning an office move or do you need to leave your current premises before the new ones are ready?<\/strong> Hiptown can help you identify <a href=\"https:\/\/hiptown.com\/en\/our-spaces\/\">a temporary office or Managed Office<\/a> to secure the transition.<\/p>\n<\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":3202,"featured_media":33872,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[320],"tags":[],"class_list":["post-33873","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offices"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Office relocation: how to plan it effectively?<\/title>\n<meta name=\"description\" content=\"How can you plan an office relocation without disrupting your team? Prepare the transition, move day and setup in your new office.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hiptown.com\/en\/office-relocation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Office relocation: how to plan it effectively?\" \/>\n<meta property=\"og:description\" content=\"How can you plan an office relocation without disrupting your team? Prepare the transition, move day and setup in your new office.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hiptown.com\/en\/office-relocation\/\" \/>\n<meta property=\"og:site_name\" content=\"Hiptown Bureaux \u00e0 Louer\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/hiptownlovesyou\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-24T14:39:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-24T14:43:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/hiptown.com\/wp-content\/uploads\/sites\/6\/2026\/09\/demenagement-bureaux.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Stephan O.\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@hiptownlovesyou\" \/>\n<meta name=\"twitter:site\" content=\"@hiptownlovesyou\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Stephan O.\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/\"},\"author\":{\"name\":\"Stephan O.\",\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/#\\\/schema\\\/person\\\/5d3323c66fa89f3fdad0ec13865e984a\"},\"headline\":\"Office relocation: how to avoid disrupting your team?\",\"datePublished\":\"2026-09-24T14:39:36+00:00\",\"dateModified\":\"2026-09-24T14:43:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/\"},\"wordCount\":4284,\"publisher\":{\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hiptown.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2026\\\/09\\\/demenagement-bureaux.jpg\",\"articleSection\":[\"Offices\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/\",\"url\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/\",\"name\":\"Office relocation: how to plan it effectively?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hiptown.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2026\\\/09\\\/demenagement-bureaux.jpg\",\"datePublished\":\"2026-09-24T14:39:36+00:00\",\"dateModified\":\"2026-09-24T14:43:12+00:00\",\"description\":\"How can you plan an office relocation without disrupting your team? Prepare the transition, move day and setup in your new office.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/hiptown.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2026\\\/09\\\/demenagement-bureaux.jpg\",\"contentUrl\":\"https:\\\/\\\/hiptown.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2026\\\/09\\\/demenagement-bureaux.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Office relocation and a team moving into new premises\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/office-relocation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hiptown.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Offices\",\"item\":\"https:\\\/\\\/hiptown.com\\\/en\\\/category\\\/offices\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Office relocation: how to avoid disrupting your team?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/hiptown.com\\\/en\\\/\",\"name\":\"Hiptown Coworking et bureau flexibles et op\u00e9r\u00e9\",\"description\":\"Coworking, Bureaux flexibles et op\u00e9r\u00e9s cl\u00e9 en main. Partout en France.\",\"publisher\":{\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/#organization\"},\"alternateName\":\"Hiptown bureaux \u00e0 louer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/hiptown.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/#organization\",\"name\":\"Hiptown Coworking et bureau \u00e0 louer ou op\u00e9r\u00e9\",\"alternateName\":\"Hiptown bureaux \u00e0 louer\",\"url\":\"https:\\\/\\\/hiptown.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/hiptown.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2022\\\/07\\\/hiptown_logo-xs.svg\",\"contentUrl\":\"https:\\\/\\\/hiptown.com\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/2022\\\/07\\\/hiptown_logo-xs.svg\",\"width\":98,\"height\":75,\"caption\":\"Hiptown Coworking et bureau \u00e0 louer ou op\u00e9r\u00e9\"},\"image\":{\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/hiptownlovesyou\\\/\",\"https:\\\/\\\/x.com\\\/hiptownlovesyou\",\"https:\\\/\\\/www.instagram.com\\\/hiptownlovesyou\\\/\",\"https:\\\/\\\/fr.linkedin.com\\\/company\\\/hiptown\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCNtbRT8HkE3s0F0AMaxX9VQ\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hiptown.com\\\/en\\\/#\\\/schema\\\/person\\\/5d3323c66fa89f3fdad0ec13865e984a\",\"name\":\"Stephan O.\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b789fbf8bb9c6e9fa796ab9ea0e37e5aed27a1780bd65bb39fc02e5f3c7e9944?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b789fbf8bb9c6e9fa796ab9ea0e37e5aed27a1780bd65bb39fc02e5f3c7e9944?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b789fbf8bb9c6e9fa796ab9ea0e37e5aed27a1780bd65bb39fc02e5f3c7e9944?s=96&d=mm&r=g\",\"caption\":\"Stephan O.\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Office relocation: how to plan it effectively?","description":"How can you plan an office relocation without disrupting your team? Prepare the transition, move day and setup in your new office.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hiptown.com\/en\/office-relocation\/","og_locale":"en_US","og_type":"article","og_title":"Office relocation: how to plan it effectively?","og_description":"How can you plan an office relocation without disrupting your team? Prepare the transition, move day and setup in your new office.","og_url":"https:\/\/hiptown.com\/en\/office-relocation\/","og_site_name":"Hiptown Bureaux \u00e0 Louer","article_publisher":"https:\/\/www.facebook.com\/hiptownlovesyou\/","article_published_time":"2026-09-24T14:39:36+00:00","article_modified_time":"2026-09-24T14:43:12+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/hiptown.com\/wp-content\/uploads\/sites\/6\/2026\/09\/demenagement-bureaux.jpg","type":"image\/jpeg"}],"author":"Stephan O.","twitter_card":"summary_large_image","twitter_creator":"@hiptownlovesyou","twitter_site":"@hiptownlovesyou","twitter_misc":{"Written by":"Stephan O.","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/hiptown.com\/en\/office-relocation\/#article","isPartOf":{"@id":"https:\/\/hiptown.com\/en\/office-relocation\/"},"author":{"name":"Stephan O.","@id":"https:\/\/hiptown.com\/en\/#\/schema\/person\/5d3323c66fa89f3fdad0ec13865e984a"},"headline":"Office relocation: how to avoid disrupting your team?","datePublished":"2026-09-24T14:39:36+00:00","dateModified":"2026-09-24T14:43:12+00:00","mainEntityOfPage":{"@id":"https:\/\/hiptown.com\/en\/office-relocation\/"},"wordCount":4284,"publisher":{"@id":"https:\/\/hiptown.com\/en\/#organization"},"image":{"@id":"https:\/\/hiptown.com\/en\/office-relocation\/#primaryimage"},"thumbnailUrl":"https:\/\/hiptown.com\/wp-content\/uploads\/sites\/6\/2026\/09\/demenagement-bureaux.jpg","articleSection":["Offices"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/hiptown.com\/en\/office-relocation\/","url":"https:\/\/hiptown.com\/en\/office-relocation\/","name":"Office relocation: how to plan it effectively?","isPartOf":{"@id":"https:\/\/hiptown.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/hiptown.com\/en\/office-relocation\/#primaryimage"},"image":{"@id":"https:\/\/hiptown.com\/en\/office-relocation\/#primaryimage"},"thumbnailUrl":"https:\/\/hiptown.com\/wp-content\/uploads\/sites\/6\/2026\/09\/demenagement-bureaux.jpg","datePublished":"2026-09-24T14:39:36+00:00","dateModified":"2026-09-24T14:43:12+00:00","description":"How can you plan an office relocation without disrupting your team? Prepare the transition, move day and setup in your new office.","breadcrumb":{"@id":"https:\/\/hiptown.com\/en\/office-relocation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hiptown.com\/en\/office-relocation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hiptown.com\/en\/office-relocation\/#primaryimage","url":"https:\/\/hiptown.com\/wp-content\/uploads\/sites\/6\/2026\/09\/demenagement-bureaux.jpg","contentUrl":"https:\/\/hiptown.com\/wp-content\/uploads\/sites\/6\/2026\/09\/demenagement-bureaux.jpg","width":1200,"height":800,"caption":"Office relocation and a team moving into new premises"},{"@type":"BreadcrumbList","@id":"https:\/\/hiptown.com\/en\/office-relocation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/hiptown.com\/en\/"},{"@type":"ListItem","position":2,"name":"Offices","item":"https:\/\/hiptown.com\/en\/category\/offices\/"},{"@type":"ListItem","position":3,"name":"Office relocation: how to avoid disrupting your team?"}]},{"@type":"WebSite","@id":"https:\/\/hiptown.com\/en\/#website","url":"https:\/\/hiptown.com\/en\/","name":"Hiptown Coworking et bureau flexibles et op\u00e9r\u00e9","description":"Coworking, Bureaux flexibles et op\u00e9r\u00e9s cl\u00e9 en main. Partout en France.","publisher":{"@id":"https:\/\/hiptown.com\/en\/#organization"},"alternateName":"Hiptown bureaux \u00e0 louer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hiptown.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/hiptown.com\/en\/#organization","name":"Hiptown Coworking et bureau \u00e0 louer ou op\u00e9r\u00e9","alternateName":"Hiptown bureaux \u00e0 louer","url":"https:\/\/hiptown.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hiptown.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/hiptown.com\/wp-content\/uploads\/sites\/6\/2022\/07\/hiptown_logo-xs.svg","contentUrl":"https:\/\/hiptown.com\/wp-content\/uploads\/sites\/6\/2022\/07\/hiptown_logo-xs.svg","width":98,"height":75,"caption":"Hiptown Coworking et bureau \u00e0 louer ou op\u00e9r\u00e9"},"image":{"@id":"https:\/\/hiptown.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/hiptownlovesyou\/","https:\/\/x.com\/hiptownlovesyou","https:\/\/www.instagram.com\/hiptownlovesyou\/","https:\/\/fr.linkedin.com\/company\/hiptown","https:\/\/www.youtube.com\/channel\/UCNtbRT8HkE3s0F0AMaxX9VQ"]},{"@type":"Person","@id":"https:\/\/hiptown.com\/en\/#\/schema\/person\/5d3323c66fa89f3fdad0ec13865e984a","name":"Stephan O.","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b789fbf8bb9c6e9fa796ab9ea0e37e5aed27a1780bd65bb39fc02e5f3c7e9944?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b789fbf8bb9c6e9fa796ab9ea0e37e5aed27a1780bd65bb39fc02e5f3c7e9944?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b789fbf8bb9c6e9fa796ab9ea0e37e5aed27a1780bd65bb39fc02e5f3c7e9944?s=96&d=mm&r=g","caption":"Stephan O."}}]}},"_links":{"self":[{"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/posts\/33873","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/users\/3202"}],"replies":[{"embeddable":true,"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/comments?post=33873"}],"version-history":[{"count":2,"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/posts\/33873\/revisions"}],"predecessor-version":[{"id":33875,"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/posts\/33873\/revisions\/33875"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/media\/33872"}],"wp:attachment":[{"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/media?parent=33873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/categories?post=33873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hiptown.com\/en\/wp-json\/wp\/v2\/tags?post=33873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}